Active Projects

Contract 22-1: Plant Water System Replacement Project Designed by AECOM

SESD’s Plant Water System has been in use non-stop for more than 25 years and is in need of replacement. SESD worked with its Engineer to design a new energy efficient system, as well as a detailed construction method to install the new pumps even as the existing pumps had to stay operational.

SESD awarded a construction contract to Waterline Industries in August 2023. The pumps and other equipment have been ordered and are expected to be installed in Fall 2024. SESD received a $200,000 “Gap Energy Grant” from the Massachusetts Department of Environmental Protection to help fund the construction. The project is planned to be completed by the end of 2024.

Related Projects

View All
Read
Read